Software Engineering Mcqs
In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?

A. Software product engineering
B. Software quality assurance
C. Software subcontract management
D. Software quality management

According to ISO 9001, the causes of nonconforming product should be____________________?

A. Deleted
B. Eliminated
C. Identified
D. Eliminated and identified

Which of the following is not an appraisal cost in SQA ?

A. Inter-process inspection
B. Maintenance
C. Quality planning
D. Testing

Which regression test selection technique exposes faults caused by modifications ?

A. Efficiency
B. Precision
C. Generality
D. Inclusiveness

Regression testing is a very expensive activity?

A. True
B. False
ExpLanation: as regression testing is performed many times over the life of the software product, it becomes a costly affair.

What type of software testing is generally used in Software Maintenance ?

A. Regression testing
B. System testing
C. Integration testing
D. Unit testing

A characteristic of a software system that can lead to a system error is known as _____________________ ?

A. Human error or mistake
B. System fault
C. System error
D. System failure