Software Engineering Mcqs
What is not included in prevention costs ?

A. Quality planning
B. Formal technical reviews
C. Test equipment
D. Equipment calibration and maintenance

The Capability Maturity Model (CMM) is a continuous model ?

A. True
B. False
ExpLanation: the cmm is discrete rather than continuous.

Which of the following is not included in failure costs ?

A. Rework
B. Repair
C. Failure mode analysis
D. None of the mentioned

Degree to which design specifications are followed in manufacturing the product is called_________________?

A. Quality control
B. Quality of conformance
C. Quality assurance
D. None of the mentioned

Which requirements are the foundation from which quality is measured ?

A. Hardware
B. Software
C. Programmers
D. None of the mentioned

Which of the following is not included in External failure costs ?

A. Testing
B. Help line support
C. Warranty work
D. Complaint resolution

Who identifies, documents, and verifies that corrections have been made to the software ?

A. Project manager
B. Project team
C. Sqa group
D. All of the mentioned

CMM stands for_____________________?

A. Capability management module
B. Conservative maturity model
C. Capability maturity module
D. Capability maturity model

ISO 9001 is not concerned with _______________ of quality records?

A. Collection
B. Maintenance
C. Verification
D. Dis-positioning

The CMM emphasizes____________________?

A. Continuous process improvement
B. The need to record information
C. The need to accept quality system
D. None of the mentioned