A. The average service rate hess than the average arrival rate
B. Output rate is linearly proportional to input
C. Output rate is constant and the input varies in a random manner
D. All of the above
A. Complete details’of items in, waiting line are known
B. Arrival and waiting times are known and can be grouped to form a waiting line model
C. All variables and constants are known and form a linear equation
D. The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known
A. Minor works
B. Major works
C. Large projects
D. All of the above
A. Minimum value
B. Maximum value
C. Average value
D. Middle value
A. a project is divided into various activities
B. required time for each activity is established
C. sequence of various activities is made according to their importance
D. network is drawn by connecting the activities and the events
A. High initial investment for the specialized facilities
B. Skilled labour to operate machines
C. Production time is longer, requiring more goods in inventory
D. High cost of inspection
A. The flow of material in the plant
B. The methods of proper utilization of manpower
C. The methods of proper utilization of machines
D. The layout of factory facilities
A. Is artificially introduced
B. Is represented by a dotted line
C. Does not require any time
D. All of the above
A. normal
B. binomial
C. beta
D. exponential
A. Event
B. Float
C. Duration
D. Constraint