Mechanical Engineering Mcqs
Job enrichment technique is applied to_________________?

A. Reduce labour monotony
B. Overcome boring and demotivating work
C. Make people happy
D. All of the above

In Halsey 50-50 plan, output standards are established______________?

A. By time study
B. From previous production records
C. From one’s judgement
D. All of the above

An optimum project schedule implies_______________?

A. Optimum utilization of men, machines and materials
B. Lowest possible cost and shortest possible time for project
C. Timely execution of project
D. To produce best results under given constraints

Which one of the following represents a group incentive plan ?

A. Scanlon plan
B. Rowan plan
C. Bedaux plan
D. Taylor differential piece rate system

In the Halsey system of wage incentive plan, a worker is ________________?

A. Paid as per efficiency
B. Ensured of minimum wages
C. Not paid any bonus till his efficiency
D. Never a loser

Break-even analysis can be used for__________________?

A. Short run analysis
B. Long run analysis
C. Average of above two run analysis
D. There is no such criterion

PERT has following time estimate_________________?

A. One time estimate
B. Two time estimate
C. Three time estimate
D. Four time estimate