The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
Question 2
Pick up the item whose weight is added to the weight of respective item, is________________?
Question 3
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
Question 4
S: 1 and length is______________?
Question 5
If the thickness of thinnest outside plate is 10 mm, then the maximum pitch of rivets in tension will be taken as______________?
Question 6
When the axis of load lies in the plane of rivet group, then the rivets are subjected to________________?
Question 7
Bending compressive and tensile stresses respectively are calculated based on_________________?
Question 8
When the axis of load lies in the plane of rivet group, then the most heavily loaded rivet will be the one which________________?
Question 9
The difference between gross diameter and nominal diameter for the rivets up to 25 mm diameter is__________________?
Question 10
If the thickness of plate to be connected by a rivet is 16 mm, then suitable size of rivet as per Unwin’s formula will be__________________?