Civil Engineering Mcqs — Test 68
Page 1 of 3
Question 1
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
Question 2
Brick walls are measured in sq. m if the thickness of the wall is_________________?
Question 3
The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
Question 4
Pick up the correct statement regarding the centre line method of estimating a building?
Question 5
The following item of earth work is not measured separately ?
Question 6
The area of the cross-section of a road fully in banking shown in the given figure, is________________?
Question 7
The measurement is made in square metre in case of_________________?
Question 8
Cost of fittings and their fixing is specified for the following sanitary fittings________________?
Question 9
For the construction of buildings, the subheads of the estimate are________________?
Question 10
The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?