System Administrator 2026
Which of the following is not a phase of virtual circuit network?
  • A. Setup phase
  • B. Data transfer phase
  • C. Termination phase
  • D. Teardown phase
Steps required in setup process are ___________
  • A. Setup request and acknowledgement
  • B. Setup request and setup response
  • C. Setup request and setup termination
  • D. Setup and termination steps
During teardown phase, the source, after sending all the frames to destination, sends a _____ to notify termination.
  • A. Teardown response
  • B. Teardown request
  • C. Termination request
  • D. Termination response
Delay of the resource allocated during setup phase during data transfer is ________
  • A. Constant
  • B. Increases for each packet
  • C. Same for each packet
  • D. Different for each packet
Delay of the resource allocated on demand during data transfer is ________
  • A. Constant
  • B. Increases for each packet
  • C. Same for each packet
  • D. Different for each packet
Two broad categories of congestion control are
  • A. Open-loop and closed-loop
  • B. Open-control and closed-control
  • C. Active control and passive control
  • D. Active loop and passive loop
In open-loop control, policies are applied to __________
  • A. Remove after congestion occurs
  • B. Remove after sometime
  • C. Prevent before congestion occurs
  • D. Prevent before sending packets
Retransmission of packets must not be done when _______
  • A. Packet is lost
  • B. Packet is corrupted
  • C. Packet is needed
  • D. Packet is error-free