Realtime Operating System Cpu Scheduling 1
Q If there are a total of T = 100 shares to be divided among three processes, A, B and C. A is assigned 50 shares, B is assigned 15 shares and C is assigned 20 shares. C will have ______ percent of the total processor time.
  • A A. 20
  • B B. 15
  • C C. 50
  • D D. None of the mentioned