Pak Study MCQs
Q How much MW electricity the Engro Powergen Thar Limited’s (EPTL) has started pumping into the national grid on 19 march 2019?
  • A A. 300 mw
  • B B. 330 mw
  • C C. 600 mw
  • D D. 660 mw
Leave a Comment